QUICK START ADVANTAGE

Site facilities   Click Here>>

  • Ready to occupy graded plots
  • Flexible plot sizes (catering to SME’s)
  • Roads
  • Effluent treatment and sewerage management system*
    Comprising effluent collection network, common effluent treatment plant (CETP), treated effluent discharge pipeline network and final out fall.
  • Common Effluent Treatment Plant
  • Storm Water Drainage
    RCC storm water drainage by side of roads.
  • Solid waste management system*
  • Fire water storage and distribution system
  • Telecommunication & Surveillance system
  • Green Belt
  • * = At battery limit

    Water   Click Here>>

    Mangalore region is blessed with abundant water. Uninterrupted water supply to the SEZ units through the following source:
    • 15 MGD water from 4 barrages on Nethravathi & Gurupur river has been approved by Government of Karnataka.
    • 10 MGD water will be available from STPs. MSEZ has signed MoA with Mangalore City Corporation in 2008.

    Power   Click Here>>

  • Power would be available from a 220KV substation adjacent to MSEZ.
  • 190 MVA of power arranged from KPTCL
  • 98 MW of power from OTPCL (proposed)
  • Support facilities advantage (proposed through concessionaires)    Click Here>>

  • Centralised Process Utility Services
  • Tank farm & Warehouse
  • Logistics services
  • Common shared facilities    Click Here>>

  • A dedicated pipeline-cum-road corridor bridges the short 8 km distance between New Mangalore International Port with the Mangalore SEZ. This ensures that material is moved in minutes between the Port & SEZ units.
  • Water treatment plant
  • Treated effluent disposal to sea
  • Proposed self-contained, integrated township with residential and commercial facilities supported by social infrastructure
  • Copyright © 2012 Mangalore Special Economic Zone India. Powered by www.magnumweb.in